OEE Calculation Example

Plant Applications performs a variety of calculations in order to arrive at OEE rates.

This is a sample calculation, with time shown in minutes. See the Glossary and the Time Categorization topics for explanations of terms:

Configuration Data

Ideal Rate

10 (units per min)

 

Actual Production Data

Total Production

1050 units  

Good Production

 1043 units

Waste (Defects)

7 units

 

Time Categorization

Minutes

Calendar Time

125   

Unavailable Time

 - 0

= Loading Time            

= 125

Unplanned Downtime   

- 5

= Gross Running Time

= 120

Performance Downtime

- 25  

= Run Time

= 95

Speed Loss (Ideal Production – Total Production) / Ideal Rate)

- 15

= Duration at Design Speed

= 80

Ideal Production (Ideal Rate * Gross Running Time)

1200

 

 

Availability Rate = (Gross Running Time / Loading Time)  X 100

 = 96.00%

Performance Rate = (Total Production / Ideal Production) X 100

= 87.50%

Quality Rate = (Good Production / Total Production) X 100

= 99.33%

OEE = Availability X Performance X Quality = .96 X .8750 X .9933

= 83.44%