Establishing Waste Locations

  1. Open the Event Configuration window on for the selected Production Unit.

  2. Select the "Waste" Event in the "Events Enabled On This Unit" list.

  3. Select "Event Properties…".

  4. The "Waste Configuration" window will appear. The selected Production Unit and its Child Units will appear as potential Locations for Waste.

  1. Select the "Waste Locations" tab.

  2. Select "Add Event Based" to establish a Location as being associated with Event Based waste.

  3. Select "Add Time Based" to establish a Location as being associated with Time Based waste only.