Establishing Waste Locations
-
Open the Event Configuration window on for the selected Production Unit.
-
Select the "Waste" Event in the "Events Enabled On This Unit" list.
-
Select "Event Properties…".
-
The "Waste Configuration" window will appear. The selected Production Unit and its Child Units will appear as potential Locations for Waste.
-
Select the "Waste Locations" tab.
-
Select "Add Event Based" to establish a Location as being associated with Event Based waste.
-
Select "Add Time Based" to establish a Location as being associated with Time Based waste only.