Configuring a Waste Model

  1. Browse to the "Plant Model" and inside the Production Line.

  2. Select the Production Unit; right-click and select "Configure Events."

  3. From the "Event Configuration" window, select the "Waste" Event in the "Events Enabled On This Unit" list.

  4. Select the "Configure Event Detection Models"  tab.

  5. Browse the "Available Models to Assign" list for a Model which is appropriate for the given situation.

  6. Select the appropriate Waste Model in the Available Models list and select "Assign Model."

  7. Specify each required Model Property for the newly assigned Model.

  8. Select each Model Property in the "Selected Model Properties" list and select "Edit."

  9. A dialog appropriate for the Data Type of each Property will appear.

  10. Select an appropriate item from the list presented, or type in an appropriate Value and select "OK."

  11. To Activate the selected Model, select the "Activate" button. Models with required Properties left blank cannot be activated.