V4.2.0.9.4 Release Notes

V4.2.0.9.4

This topic provides a list of product changes included in this patch.

RBI 580

DescriptionTracking ID
You can now calculate the RBI PRD Criticality Analyses in bulk from the Assets section of the following pages:
  • Risk Based Inspection Overview
  • Unit Summary
  • Corrosion Loop
US398641