Previously, if you imported the Standard Batch Cycle Time and Standard Batch Size for a Production Profile using the Production Loss Analysis (PLA) 1-Admin Data Loader, the Maximum Sustained Capacity Rate (MSCR) and Maximum Sustained Hourly Rate (MSHR) values were not updated. This issue has been resolved. | DE126436 |
Previously, in Production Loss Analysis, with the Maximum Sustained Hourly Rate (MSHR) set to be calculated automatically, the calculation was based on the Maximum Demonstrated Rate. When the batch cycle time was less than or greater than a day, it displayed incorrect values. This issue has been resolved. Now, the MSHR auto-calculation is based on the Maximum Sustained Hourly Rate and the batch cycle time is displayed correctly. | DE122813 |
Previously, in the Production Profile datasheet, the value in the Planning Rate box appeared without a description due to which you could not interpret the data. This issue has been resolved. Now, the value in the Planning Rate box appears with the full description of the selected units in the Standard Batch Size and Standard Batch Cycle Time boxes (for example, 12345 Barrels/0.25 Day). | DE121266 |
Previously, in the Production Profile datasheet, in the Max Demonstrated Rate box, you could not enter a value that was less than that in the Standard Batch Size box. This issue has been resolved. | DE121266 |
Previously, when modifying a Plan Template or creating a Production Plan using a Plan Template, if you modified the Plan Start Time, the Plan End Time was not automatically updated based on the duration specified in the template. This issue has been resolved. | DE120291 |
Previously, in a Production Event record, you could not remove the Production Event Code associated with the Production Event. This issue has been resolved. | DE117125 |