Fourth Quarter of 2022

Release Date: December 13, 2022

This topic provides a list of product changes released for this module on this date.

Table 1. Enhancements and New Features

The following enhancements and new features have been added.

DescriptionTracking ID
To enhance usability, you can now link the analysis to one or more assets or functional locations for the Spares Analysis section. To facilitate this enhancement, the Linked Assets tab has been added in the Analysis Summary workspace. US540477
Table 2. Resolved Issues

The following issues, which existed in one or more previous versions, have been resolved.

DescriptionTracking ID
Previously, in a System Reliability Analysis, when you specified values for a New TTF Distribution and saved them, the Beta and Eta values would default to zero and not reflect the values from the new distribution. This issue has been resolved.DE186012
Previously, in a Reliability Distribution Analysis, when you adjusted the X-axis range, the setting was not retained between the plot tabs. This issue has been resolved.DE183604
Previously, the Probability Distribution workflow in the documentation was incorrect. This issue has been resolved.DE182309
Previously, in Automation Rules, when you attempted to merge two or more analyses, the values in the Number of Assets column were incorrectly displayed as the sum of number of assets and number of failures. This issue has been resolved.DE176522
Previously, in System Reliability Analysis, when a planned resource was linked to a risk, if the same risk was then linked to an unplanned resource, the resource would be removed from the planned resource list and could not be added back. This issue has been resolved.

Now, the planned resource is not removed from the correct resource list.

DE162457
Previously, in a Reliability Distribution for a Probability plot, the x and y coordinates continued to be displayed and were updated even for the Show data view of the chart component. This issue has been resolved.DE153062
Previously, in System Reliability Analysis, the value on the Resource Time graph was incorrect if the resource time was being rounded to three decimal places. This issue has been resolved.DE146552
Previously, if you did not have delete permission and when you attempted to delete a Reliability Analysis, an error occurred. This issue has been resolved. Now, in this scenario, a message appears indicating that you do not have delete permission.DE138241