Second Quarter of 2020
Release Date: May 8, 2020
This topic provides a list of product changes released for this module on this date.
Description | Tracking ID |
---|---|
Previously, if you promoted a Reliability Centered Maintenance (RCM) or Failure Modes and Effects Analysis (FMEA) analysis to a strategy, and then attempted to optimize the actions of the strategy, the optimization of the actions took longer than expected. This issue has been resolved. | DE122631 |
Previously, when you attempted to optimize a strategy with an action type other than condition-based maintenance and do run simulation, an error message appeared. This issue has been resolved. | DE120644 |