Second Quarter of 2025
Release Date: June 27, 2025
This topic provides a list of product changes released for this module on this date.
RBI 580 and RBI 581
Description | Tracking ID |
---|---|
You can now map RBI Components linked to an Asset on the Schematic View (2D Visualization) and visualize the risk of the components. To enable this enhancement, you can now access Schematic View from the Asset Summary workspace. An active Mechanical Integrity 2D Visualization license is required to avail this functionality. | 921600 |
You can now model an RBI Component as a Sphere. To facilitate this enhancement, a new component type named Sphere has been added and is available when creating components with the Cylindrical Shell family. Additionally, Sphere has been added to the Equipment Types family. This enhancement will allow for the calculation of inventory for spheres for both RBI 581 Risk Analyses and RBI 580 Criticality Analyses. | 916882 |
You can now customize field mappings from RBI Recommendations to Actions when promoting an RBI Asset to Asset Strategy Management. To facilitate this enhancement, the field mappings for RBI Recommendation to Actions have been moved to Policy Manager and a new policy named RecommendationToActionMapping has been added. | 880136 |
You can now customize field mappings from RBI Degradation Mechanisms to Risks when promoting an RBI Asset to Asset Strategy Management. To facilitate this enhancement, the field mappings for RBI Degradation Mechanisms to Risks have been moved to Policy Manager and a new policy named DegradationMechanismToRiskMapping has been added. | 880134 |
To improve usability, you can now open the RBI Bulk Evergreening workspace from the Process Unit workspace. The RBI Bulk Evergreening workspace will display any analyses eligible for evergreening, which are linked to assets related to the given process unit. | 867344 |
An error message will now be displayed when finalizing the risk of an RBI Analysis that has not been calculated after additional field changes have been made. This will be indicated on the RBI Analysis page by the orange-colored calculator button. This option can be turned off by clearing the Calculation Required before Risk Completion check box under the RBI Admin Settings. | 867341 |
Description | Tracking ID |
---|---|
Previously, analyses in custom states were considered active and were included when rolling up the risk categories for an Inspection Plan. This issue has been resolved. Now, analyses in custom states are excluded from the risk category roll-up for an Inspection Plan. | 1019742 |
Previously, if an RBI Analysis was in any state other than Created or Archived, it was marked as Active in the RBI Tree (indicated by ![]() ![]() | 1019738 |
Previously, when finalizing an RBI Criticality Analysis with a configured Risk Category value, an error occurred. If the Alternative Inspection Plan was enabled, the error occurred while updating the inspection plan. This issue has been resolved. Now, user-configured risk categories are not considered in the RBI Inspection Plan Risk Category field. | 1012586 |
Previously, tile counts were not displayed on the Risk Based Inspection Overview workspace due to performance issues. To enhance performance of the Risk Based Inspection Overview workspace, the following catalog query has been updated: Public\Meridium\Modules\Risk Based Inspection\Queries\Inspections More Current Than All Analysis | 967980 |
Previously, the Require Calculation field, which turns the Calculator button to orange on the RBI Analysis Page, was not set to true on analyses when linking or unlinking TML Groups from the parent RBI Component. This issue has been resolved. | 959779 |
Description | Tracking ID |
---|---|
Data Mapping between the RBI Component field CM Corrosion Rate and the Analysis field Cladding Material CCT has been removed as it is no longer valid. | 697550 |
RBI 581
Description | Tracking ID | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Previously, the Personal Injury Constants for Acid-LP, Acid-MP, and Acid-HP were incorrect. This issue has been resolved. As a result, the SHE consequence area for these specific fluids may be affected. To update any pre-existing analyses, which will be affected by this change, follow the steps in KBA 000071457. | 996649 | ||||||||||
To improve usability, while duplicating an RBI 581 Risk analysis, creating a 581 What-If analysis, or applying an RBI 581 Risk Analysis within the RBI Asset, the linked inspections on the following Degradation Mechanism Evaluations will automatically be assigned to the Degradation Mechanism Evaluations in the newly created RBI 581 Risk analysis, if the Use Combined Confidence check box is selected:
| 943747 | ||||||||||
To improve usability, while duplicating an RBI 581 Risk analysis, creating a 581 What-If analysis, or applying an RBI 581 Risk Analysis within the RBI Asset, the linked inspections on the following Degradation Mechanism Evaluations will automatically assigned to the Degradation Mechanism Evaluations in the newly created RBI 581 Risk analysis if the Use Related Inspection check box is set checked:
| 943743 | ||||||||||
To improve usability, the Allow Override of SHE Consequence Area field in an RBI 581 Consequence Evaluation is now dynamically disabled in scenarios where the SHE Consequence is not considered. To facilitate this enhancement, Allow Override of SHE Consequence Area is only enabled if the parent RBI 581 Risk Analysis is not linked to an RBI 581 HE Bundle Damage Evaluation and the Component Type of the parent RBI 581 Risk Analysis is not set to Storage Tank Bottom. | 919151 | ||||||||||
New materials are added to support RBI 581 calculations. To facilitate this enhancement, the following Material Cost Lookup records have been added:
| 867333 | ||||||||||
Risk Mapping for an RBI 581 Risk Analysis linked to an RBI 581 HE Bundle Damage Evaluation is now performed using a new policy named MI_581HETB-DEF-RISK_MAPPING-OPERATIONS. This policy is used to map values from an RBI 581 Risk Analysis with values plotted on the default Risk Matrix. Note: If you use a customized Risk Matrix, you must add the required RBI Risk Matrix Mapping records and update the policy to map with the custom Risk Matrix. | 365655 |
Description | Tracking ID |
---|---|
Previously, in an RBI 581 HE Bundle Damage Mechanism, the adjusted characteristic life (Adjusted ETA) calculation for methods 1 and 2 was incorrect if the Highest Effective Inspection field was set. This issue has been resolved. | 996332 |
RBI 580
Description | Tracking ID |
---|---|
To improve usability, while duplicating an RBI Criticality Analysis, creating a 580 What-If analysis, or applying an RBI Criticality Analysis within the RBI Asset, the linked inspections on the Degradation Mechanism Evaluation will be automatically assigned to the Degradation Mechanism Evaluations in the newly created RBI Criticality Analysis if the Use Combined Confidence field is selected and the inspection falls within a 20-year duration. | 943749 |