Configuration for Tracking Downtime

  1. Audit Available Signals For Automating Downtime Detection

  2. Establish The Physical Layout Of Units On The Production Line

  3. Configure Reason Trees For Classifying Downtime Causes

  4. Configure Reason Tree For Classifying Corrective Actions

  5. Configure The Downtime Event On The Target Unit

  6. Establish Possible Downtime Locations

  7. Assign Reason Trees To Each Downtime Location

  8. Establish The Fault List And Default Reasons

  9. Configure and Activate the Downtime Detection Model

  10. Create A Downtime Display

© 2025 GE Vernova and/or its affiliates. All rights reserved.             Privacy | Terms | Cookies | Accessibility