Balancing the grid
GE Vernova is playing a key role in supporting Taiwan’s energy transition, which includes the government’s goal of increasing natural gas to 50% of the energy mix. We work closely with our key customer, Taiwan Power Company (TPC), to deliver reliable power and grid resilience across the country.
Learn more about how we are helping balance Taiwan’s electricity grid and meet future demand.
Datan 7: Delivered 600 MW of power in a record 9 months using two 7HA.02 turbines and two H65 generators.
Datan 8 & 9: Operating four 7HA.02 turbines to support the transition to a cleaner energy mix.
Hsinta: Deploying six advanced HA gas turbines in Southern Taiwan as part of our fourth major HA project to significantly boost regional generation capacity.
Taichung: Installing four HA gas turbines at this site to modernize infrastructure and support the government’s energy transition policy of replacing coal with gas to enhance grid reliability.
Tung Hsiao: Providing six LM2500XPRESS* aeroderivative gas turbines for the power plant renewal project, offering fast-start capability to manage shortages, stabilize the grid, and support renewable growth.
Grid firming
With an aim of achieving a 2050 net-zero goal, the Taiwan Government has set four major transition visions: a more diversified energy transition, a more innovative industrial transition, a lower-carbon lifestyle transition, and a more resilient social transition. To achieve these targets, Taiwan needs the addition of another energy source to provide secure and stable power supply at any time, particularly when the sun isn’t shining or the wind isn’t blowing.
Grid firming—also known as nameplate capacity firming, capacity firming, or renewable firming—is widely used to keep the grid stable in the face of potential wind, solar, and hydro intermittency. Gas-fired power plants are available regardless of the time of day or weather conditions, providing dependable capacity as long as needed—minutes, hours, days or weeks at a time. If gaps arise in renewable energy supply, an ancillary resource like a GE Vernova gas turbine fills those gaps and helps maintain grid stability.
In military deployments, expeditionary bases, or contingency response scenarios, power demand can be mission critical. GE Vernova’s TM2500 mobile gas turbine system offers rapid deployment. Once installed, our gas turbine power units ramp up to full power within five minutes, meeting power requirements quickly. It has up to 40% efficiency, higher than most grids, and can add up to 37 MW of power as your needs increase.
The latest technology
GE Vernova introduced H-class technology to the industry 26 years ago. Today, GE Vernova's HA product portfolio is engineered to reduce carbon emissions and help support today’s flexible power generation needs. Our HA gas turbine fleet is the latest evolution of our proven 7F technology, and it features the lowest cost conversion of fuel to power—which translates to more power at a lower cost. In fact, based on our many commissioned projects around the world, the 7HA gas turbine can deliver the lowest cost per kWh as compared to other gas turbine technologies.
If you’re looking to add smaller blocks of power to existing plants, aeroderivative gas turbines are a fast, cost-effective solution. With more than 240 million total operating hours, our aeroderivative gas turbines offer flexible and reliable power with engineering expertise from aviation engines.
Cost-effective, proven technology
The 7HA.03 gas turbine is GE Vernova's most efficient 60Hz gas turbine, featuring 63-64% net combined-cycle efficiency.
A leader in H-class technology
The highly efficient, air-cooled 7HA gas turbine is an industry leader in the H-class space, delivering exceptionally low lifecycle costs per megawatt.
Field and test cell validated
Installing a gas turbine in your plant shouldn’t involve any risks. Across our HA fleet, each original turbine is put through a rigorous full-speed, full-load (FSFL) validation test at our Greenville, South Carolina facility. This $200 million investment allows us to push the units beyond real-world conditions—running the turbines at 110% of their rated speeds at load, and replicating the harshest conditions, from the Arabian desert to the mountains of Colorado—all to help ensure that our customers have security of supply for their end users.
Cost-efficient conversion of fuel to electricity
Our H-class gas turbines enable the most cost-effective conversion of fuel to electricity to help utilities meet increasing power demands while saving fuel and operating costs and meeting local emissions requirements. Our HA gas turbines have earned two world records for efficiency—one for powering the world’s most efficient combined-cycle power plant for EDF in Bouchain, France (achieving 62.22% efficiency on a net combined-cycle basis on a 50 Hz grid), and a second world record for achieving 63.08% gross efficiency on a 60 Hz grid at the Nishi-Nagoya Power Station in Japan.
A powerful installed base
GE Vernova introduced the first H-class gas turbine 26 years ago, and since then our engineering teams have been making continuous performance enhancements. Now GE Vernova’s fastest-growing gas turbines in its class, our HA fleet of 50 commercial units has accumulated more than 3M operating hours. In total, more than 55 customers have ordered more than 200 gas turbines. Learn more about the benefits of the HA gas turbine fleet.
Faster installation reduces time and cost
GE Vernova’s HA gas turbine auxiliary systems are pre-configured, factory-assembled and tested modules engineered to reduce field connections, piping, and valves. This translates to a simpler, faster installation that requires less labor and reduces field schedule and installation quality risks while improving overall installation times—up to 25% quicker compared to GE Vernova's F-class gas turbine enclosures. This modular configuration also makes it easier for technicians to perform any needed maintenance over the gas turbine’s lifecycle.
The aero advantage
Born from aviation technology 60 years ago, our aeroderivative portfolio features highly flexible and mobile technologies for a wide variety of applications, including utility generation, marine propulsion, district heating, grid stability, and mobile power. GE Vernova has an installed base of >4,000 aeroderivative gas turbines deployed in >60 countries representing more than 59 GW of installed capacity, with a total of >over 240 million operating hours. Our LM2500XPRESS aero gas turbine is already the gas turbine of choice for TPC, which ordered six LM2500XPRESS gas turbines for its Tung Hsiao Power Plant Renewal Project.
GE Vernova recently announced selective catalytic reduction (SCR) upgrades—a post combustion process that effectively reduces the nitrogen oxide (NOx) emissions produced by lean-burn diesel or gas engines—for the TM2500 and LM2500XPRESS, aeroderivative gas turbines.
LM2500XPRESS gas turbine
The LM2500XPRESS aeroderivative gas turbine is 95% factory assembled into simplified modules for fast and easy site installation and has an 80% reduction in electrical interconnects compared to traditional plants. For customers who need power in days, the LM2500EXPRESS can be installed in less than 30 days with a minimal crew. Its plug and play nature enables flexible power where it is needed quickly and efficiently.
TM2500 gas turbine
With more than 30 years of experience and over 350 units installed around the world, the TM2500 is a proven solution for providing a baseload bridge to permanent power installations or for generating backup power in the wake of natural disasters, plant shutdowns, grid instability or isolated locations. Get the power you need—fast—with the TM2500 mobile aeroderivative gas turbine generator set.
GE Vernova has been playing an important role in supporting the development of Taiwan since 1961. Today, GE Vernova unites our portfolio of energy businesses—Power, Wind, Electrification—under an integrated, focused force to further propel Taiwan’s transition to a low-carbon future.
GE Vernova-built technologies serve as a backbone for power generation across Taiwan, reflecting our commitment to the island's energy reliability. Beyond our infrastructure projects, we are actively fostering local innovation—such as our recent Innovation Challenge, which empowered industry leaders, academics, and youth to co-create sustainable energy solutions. With our deep global expertise across diverse industries, we are uniquely positioned to support Taiwan’s ambitious “Pathway to Net-zero Emissions in 2050".
GE Vernova is the world leader in the application of fuels containing hydrogen in gas turbines. Over the last 50 years, our turbines have logged more than 10 million+ operating hours operating on hydrogen and associated low-Btu fuels using concentrations ranging from 5% to 95% (by volume) of hydrogen. GE Vernova is also supporting Taiwan’s energy transition through advanced electrification technologies, engineered to help integrate more renewable energy and enhance grid stability, as well as wind repowering projects that help extend turbine life and support energy security.
Browse the assets below for more information, including webinars, interviews, and news highlighting milestones in GE Vernova’s decarbonization efforts.
With local repair capabilities and the strength of our global expertise, GE Vernova is the service provider of choice in Asia, where we have 90% in-region self-sufficiency for heavy-duty gas turbines—including the HA. The Advanced Manufacturing & Repair Technology Center (AMRT) in Singapore is dedicated to providing H-class combined-cycle plant operators with fast support.
We have expanded our regional footprint with our new Taiwan Tool Center in Taoyuan City. Located near key transport hubs, this facility ensures faster response times and enhanced logistics support.