Third Quarter of 2024
Release Date: September 27, 2024
This topic provides a list of product changes released for this module on this date.
RBI 580 and RBI 581
Description | Tracking ID |
---|---|
In the RBI Inspection Plan workspace, when implementing Inspection Tasks from RBI Recommendations or Inspection Plan Detail records, the Task Details field is now prepended with the current date in UTC format. | 619283 |
To enhance performance in loading the Risk Based Inspection Overview workspace, the following catalog items have been updated:
Note: Current Risk and Current Risk Overview sections in the RBI Overview Dashboard page will only display the data from the past 10 years. |
|
You can now customize field mappings for implementing Inspection Tasks from RBI Recommendations. To facilitate this enhancement, the field mappings for RBI Recommendation to Inspection Task have been moved to Policy Manager and a new policy RecommendationToInspectionTaskMapping has been added. | 551016 |
You can now customize field mappings for implementing Inspection Tasks from RBI Inspection Plan Details. To facilitate this enhancement, the field mappings for Inspection Plan Details to Inspection Task have been moved to Policy Manager and a new policy InspectionPlanDetailToInspectionTaskMapping has been added. | 551015 |
A component filter is now added to the filter options on the RBI Tree. When you apply this filter, only the components belonging to the selected component families are displayed in the tree. Note: The description of the following system codes have been updated in the MI RBI COMPONENT FAMILIES System Code Table:
While creating a new component, updated system code descriptions will be displayed in the Component Family picklist. | 365668 |
Description | Tracking ID |
---|---|
Previously, the Asset ID field in RBI Recommendations was not updated when applying an RBI Analysis to another Asset with Copy Recommendations set to true and the Generate Recommendations in Created State admin preference set to true. This issue has been resolved. The Asset ID field will now be updated with the Asset ID of the new parent Asset. | 645845 |
Previously, when you updated Degradation Mechanism or Consequence Evaluation and then attempted to update the related RBI Analysis datasheet, an error occurred. This issue has been resolved. | 651801 |
Previously, when you saved an RBI Component datasheet, the Asset Info Summary button (![]() | 573078 |
RBI 581
Description | Tracking ID |
---|---|
Performing an RBI 581 Risk Analysis on an RBI 581 HE Bundle Damage Evaluation is now supported. Using this feature, you can calculate the financial risk and perform inspection planning for heat exchanger bundles as per API 581 3rd Edition, Risk Based Inspection Methodology Part 5-Special Equipment- Heat Exchanger Tube Bundles. To facilitate this enhancement, the following changes have been made:
Note: You cannot use RBI 581 HE Bundle Damage Evaluation along with other degradation mechanisms to perform HE Bundle calculation on an RBI 581 Risk Analysis. Optimal bundle replacement frequency is not supported as part of this feature. Important: This is a new damage mechanism model. You may review the Heat-Exchanger Bundle Components and assign this PDM if applicable and run an RBI 581 Risk Analysis. | 583456 |
You can now perform Inspection Planning at individual Degradation Mechanism level in the RBI 581 module. You can determine the Target Inspection Date at the Damage Mechanism level, which provides a granular approach to Inspection Planning. The Target Inspection Date is also calculated at the analysis level based on the driving Degradation Mechanism. The following new fields have been added to the Damage Mechanism to capture the planning results:
Important: If this option is enabled, this will impact the Target Inspection Date and Risk Results for each damage mechanism. You will have to re-run all the respective analyses. | 532769 |
Description | Tracking ID |
---|---|
Previously, in Inventory Groups section, when you attempted to search for the inventory group in the Process Units tree, then the associated components that could be linked to the inventory group were not displayed. This issue has been resolved. | 562572 |
Previously, if you set Evaluate all RBI 581 Risk Targets preference to true, then in Risk Results tab of RBI 581 Analyses, the Target Inspection Date (without Plan) was displayed incorrectly. This issue has been resolved. Now, the column is populated with the value calculated for the Target Inspection Date for the Driving Risk. Important: If Evaluate all RBI 581 Risk Targets preference is set true, then you will have to re-run all analysis that are impacted by Target Inspection Date. | 559686 |