Second Quarter of 2022
Release Date: June 24, 2022
This topic provides a list of product changes released for this module on this date.
Description | Tracking ID |
---|---|
Previously, when calculating a Thinning and Lining Damage Mechanism Evaluation where the Cladding field was set to true in the parent RBI 581 Risk Analysis, the Expected Metal Loss Fraction (Art) field was calculated using the incorrect cladding corrosion rate based on the Selected Base Material Corrosion Rate field. This issue has been resolved. Now, the Expected Metal Loss Fraction (Art) field is calculated using the cladding corrosion rate based on the Selected Cladding Material Corrosion Rate field. | DE181237 |
Previously, when an RBI 581 Risk Analysis had both Thinning Damage and Lining Damage Mechanisms, and the Governing Damage Mechanism between Thinning and Lining differed on the Plan Date without Inspection and Target Inspection date, the Damage Factor with Plan was calculated incorrectly. This issue has been resolved. | DE175930 |
Previously, as a multiple site user, when you created an RBI 581 Inventory group, the site was set based on the users default site instead of the Process Units site. This issue has been resolved. Now, a newly created RBI 581 Inventory Groups site is set based on the Process Units site. | DE175352 |