Steps
Select Import New.
The Import Data window appears.
In navigation tree, select the data loader category, and then select the data loader that you want to use to import data according the following table.
Data Loader Category | Workbooks in the Category |
---|---|
APM Connect | APM Family
|
APM Failure Elimination | Production Loss Analysis (PLA)
|
APM Foundation | Asset Criticality Analysis (ACA)
|
APM Health | Rounds Allowable Values
|
APM Mechanical Integrity | Inspection Management (IM) Assets
|
APM Power Generation | |
APM Safety | Calibration
|
APM Strategy | Asset Strategy Management (ASM)
|
Select Import.
The job is run.
Results
The Status and Log column on the Data Loaders page displays the status of uploading and uploaded jobs. The following table describes the status conditions for data import jobs.
Status | Description |
---|---|
Complete | Data has been imported successfully into Meridium Enterprise APM. |
Errors | Upload is complete with one or more errors indicated. |
Staging Failure | Intermediate data import staging failed. |
In Progress | Data import staged successfully; preparing to import into Meridium Enterprise APM. |
Staging In Progress | Intermediate data import staging is in progress. |
Waiting | Data import is queued and will begin the import. |
Copyright © 1993-2016 Meridium, Inc. All rights reserved.