Clock Off a Serial/Lot
Before you begin
Procedure
- Access the work order for which you want to clock off a serial/lot.The page for the work order appears, displaying the Current Status section.
- Select Clocked On.The Clocked On section appears, displaying a list of clocked on or clocked off records for the work order.
- In the row containing the combination of the operator, serial/lot, and the operation that you want to clock off, in the ACTIONS column, switch the toggle.Note:The toggle in the ACTIONS column is enabled only if the serial/lot is currently clocked on by the operator.