In 2017, GE Vernova was awarded, through its joint venture KAPES, the first phase of the East Power Converter (LCC) project to design and supply equipment for a 220 km energy corridor from Donghaean on the East coast, to Shingapyeong near Seoul metropolitan area. The 4 GW power capacity HVDC link will be configured as a bi-pole, with a rating of ±500 kVDC.
File Reference
PEA-1664
Publish Date
Resource Category
HVDC
Resource File Link
/grid-solutions/sites/default/files/resources/products/applications/hvdc/eastpower-hvdc-casestudy-en-2020_08-grid-pea-1664.pdf
Resource Type
13
Resource Type Name
White Papers/Case Studies
Resource Passport Required
On
Resource Type
InduStry Id List
2,3,4