Case Study: Sasaram HVDC project
Sasaram HVDC project case study
Sasaram HVDC project case study
Case study on the 2,386 km HVDC transmission link in Rio Madeira
Case study on the HVDC thyristor valve and control technology upgrades at Nelson River
Case study on the solution for de-icing HVDC equipment
Case study on the renewals of the HVDC link between Sweden and Denmark
Case study on the 400MW HVDC project linking South Korea and Jeju Island
Case study on transmitting power at the heart of a densely populated city using HVDC
Work to complete the DolWin3 grid connection is proceeding at full speed so that the connection can be brought online in 2018.
GE Vernova Helps Nalcor Energy Build An Energy Corridor Moving More Power From Labrador to Newfoundland and Nova Scotia