Extending the life, performance and flexibility
of hydropower plants

Refurbishment Solutions

By 2030, about 40% of the global hydropower fleet will be at least 40 years old. These plants were built for past system needs and can now be refurbished to increase their output, improve their efficiency and enhance their flexibility and cycling capability.

francis turbine

GE Vernova has the experience of refurbishing hydropower plants for many decades. We upgrade the full range of equipment from turbines and generators to control systems, excitation systems and speed governors.

kaplan turbine

Refurbishment allows hydropower plants operators to:

  • Deploy standardized upgrade packages during planned maintenance to limit downtime and speed execution
  • Extend lifetime of asset
  • Upgrade performance and output
  • Facilitate Environmentally friendly solutions
  • Bring even more flexibility to the energy transition

francisrunneratsoreltracymanufacturing facility

Performance and flexibility upgrades

  • Up to 7% improvement in overall efficiency
  • Up to 50% increase in output for optimized peak capacity
  • Turbine, generator and control system upgrades to operate closer to peak efficiency over a wider range

dissolved oxygen

Environmental and fish-friendly technologies

  • Bulb and Kaplan oil free technology to reduce the risk of oil entering waterways
  • Fish-friendly options for Kaplan and Bulb units backed by more than 25 years of experience
  • Distributed aeration runner injecting smaller and well distributed air bubbles to better preserve aquatic life while maintaining high efficiency with the added benefit of enabling a wider range of operation

 francisturbineatsoreltracy manu

Targeted mechanical and hydraulic modernization to boost performance and ensure long-term asset reliability

  • Internal flow and component upgrades to maximize turbine efficiency and performance
  • Hydrostatic water guide bearings to improve efficiency and eliminate oil-based lubricants
  • Targeted designs matched to modern operating patterns, minimizing component changes to reduce cost and downtime
  • High impact gains in part load efficiency, operating range, transition times and peak power output
  • Extended asset life backed by state-of-the-art model testing and component performance guarantees
Toktogul Modernization project, Kyrgyzstan

Toktogul Modernization project, Kyrgyzstan

GE Vernova completed the four unit's modernization for the Toktogul project after five years of mobilization at site. The four Francis hydro power have been modernized to ensure efficient and safe operation of the plant for the coming decades. Each unit now produces approximately 17% more energy, increasing from 307 MW to 360 MW of maximum power each, so that the site's capacity has increased from 1,200 MW to 1,440 MW in total, adding about 6% to Kyrgyzstan's current energy capacity.

Toktogul is the largest hydroelectric power plant in Kyrgyzstan and accounts for approximately 40% of the country's electricity production. The modernization of the plant allows for the supply of approximately 200,000 additional households. The Toktogul project represents a major advancement for Kyrgyzstan, contributing significantly to the country's energy security. By increasing electricity production capacity, the plant helps meet the growing energy needs of the population and industry. This project demonstrates Kyrgyzstan's ability to invest in a sustainable future.

Pit Stop Approach

GE Vernova Hydro Power developed the Pit Stop strategy to respond to the critical need for shorter outages. Inspired by the efficiency of professional racing teams, this approach allows major upgrades to be executed within the window of a standard planned maintenance cycle.
 
By utilizing preassembly and standardized installation procedures, we prepare components and workflows in advance. This enables our teams to replace and upgrade critical parts in a fraction of the time required for traditional refurbishments, returning your assets to service faster and maximizing energy generation.

Key benefits of the Pit Stop approach:

  • Accelerated execution through advanced planning and preassembly of components
  • Minimized downtime by completing major modernizations within standard maintenance windows
  • Reduced revenue loss by returning assets to operation significantly faster than traditional methods
  • Proven reliability using standardized processes to ensure high quality and predictable results

Long term collaboration

Refurbishment works best in the context of stable and long-term partnerships.
Long term collaboration

GE Vernova Hydro Power works with customers through multi-year programs and frame agreements to:

  • Plan and scale the supply chain
  • Secure manufacturing and engineering capacity over the duration of the program
  • Apply a “one team” approach to optimize project costs, schedules and outages
  • Save significant time in project realization by leveraging standardized processes and early-stage planning
  • Secure resources and business plans providing stability and technical certainty required for large scale investment decisions

CUSTOMER STORIES

From initial assessment to commissioning, GE Vernova works alongside customers to modernize and optimize existing hydropower assets. These customer stories highlight how our refurbishment expertise and technologies help improve reliability, efficiency, and long-term asset performance.