Proven. Innovative. Simplified.
Discover how our breakthrough BWRX-300 innovation, coupled with a proven design, can reduce cost and risk.
Powered by commercially available fuel, the BWRX-300 features an innovative and simplified configuration, resulting in less concrete and steel needed for construction. The BWRX-300 is a cost- competitive solution that can be deployed for electricity generation and industrial applications, including hydrogen production, desalination, and district heating. It features significantly less capital cost per MW when compared with a typical water-cooled SMR, and using a combination of modular and open-top construction techniques, the BWRX-300 can be constructed in 24-36 months while achieving a volume reduction in plant layout.
Our solutions
Recent commercial wins
A legacy of achievement
1939
First GE involvement in nuclear physics
1955
GE Atomic Division established
1957
Vallecitos BWR AEC License #1
1962
NPD achieves full power—first reactor in Canada
1974
25th BWR—Peach Bottom Unit 3
1986
50th BWR—River Bend Nuclear Generating Station
1996
1st Gen III reactor (ABWR) built on-time on-budget
2014
ESBWR U.S. NRC License
2017
BWRX-300 launched
2020
Natrium™ launched
2022
First commercial contract for BWRX-300
2023
TVA, OPG, and SGE invest in BWRX-300 common design
2024
BWRX-300 completes Step 1 of UK’S GDA process
2025
Darlington site receives full approval for BWRX-300 construction
Contact us