Whether it’s for engineering consultation or on-site assistance, GVH’s pioneering nuclear technical expertise dates from the dawn of the nuclear power era. So you can be sure that your issue(s) will be handled with the utmost skill and care.
Available services
GVH nuclear technical service products
Engineering evaluations
Analysis
Thermal-hydraulic
Structural
Fatigue
Vibration
Flaw handbooks
Risk assessment
Justification for continued operation (JCO)
List of Parts Affected (LPA) – aka lost parts
Licensing support
BWR system support and evaluations
Evaluations
Reactor internals
Pressure/temperature curves
Hardware
Engineering consultation
Systems
Chemistry
Radiological control (RADCON
Reliability services—solutions and improvement strategies
Performance and aging assessments
System/component levels
Improvement plans
Reliability strategies
Plant life management
Life cycle studies (40 +20 +20 years)
Aging management programs
Reactor aging management (RAM)
Long-term asset management
10-year plan development
Risk mitigation strategies
Parts intelligence
Outage readiness/support
Part assessments (PAMS)
Obsolescence evaluations and solutions
Other services
On-site experts
Engineering assistance with regulator inquiries
24/7 emergent/outage technical support
GVH commitment
To help the boiling water reactor (BWR) fleet be the best of the best with tailored support to meet your needs
The alternate decay heat removal (ADHR) system can reduce outage durations by 5 to 7 days. Learn more about how this system makes it possible to achieve a full return on investment in a single outage