White Paper: Leader or Follower, Developing the Smart Grid Business Case
This paper discusses the key driving factors behind smart grid momentum, the challenges facing utilities, and suggests how utilities should think about developing their comprehensive smart grid business cases.
Case Study: Design & Implementation of an Islanding and Load Shed System
This paper presents the design and implementation details of a control system that detects an island condition in an industrial facility and executes a multi-tier load shed based on the load-generation balance.
Case Study: Investing in Continuous Transformer Testing
This paper shows that bushings and tap changers are critical as the active part in terms of the root cause of failure. Action steps are described to prevent from failure and ensure electrical power reliability.
Model CTW3T10
Model: CTW3-60-T10; Voltage Class: 5 kV, 60 kV BIL
Model 475I
Model: 475I VT; 300 VA