Link a BOM Item to Multiple Operations

About this task

A bill of material (BOM) contains BOM formulations that define a list of items and the quantity of each BOM item needed to produce a product. You can link a BOM item to multiple operations. You can link multiple BOM items to multiple operations.

Before you begin

  • Ensure that the route is linked to the BOM formulation that is associated with the BOM items that you want to link. To do so, in the Edit Route window of the route, select the appropriate value in the BOM Formulation box.
  • Create an operation in the route.
  • Select to synch the latest BOM item details.

Procedure

Results

Each BOM item is linked to the selected operations.

What to do next

Attach a document to the route.