The Perth Aeroderivative Services Level 2 facility and tooling store provides enhanced support to the GE LM6000, LM2500 and LMS100 aeroderivative gas turbine fleet installed in Australia. The facility enables faster and more flexible execution of planned and unplanned maintenance, most of which would take place within the country, with a consequent reduction of the repair cycle time and logistics costs for Australian aeroderivative power plant operators.

In addition, the facility includes a tooling store operated by FieldCore (GE’s field services company), which will serve the entire GE fleet within the Asia region to help provide faster availability of tools for aero hot gas path section repairs and engine exchange tooling kits to accelerate completion time for outages.