The world’s need for sustainable and reliable energy has never been greater, and the BWRX-300 small modular nuclear reactor can help meet that need.
GE Vernova Hitachi’s (GVH) BWRX-300 is not a concept, a plan, or a PowerPoint. It's now under construction. Its configuration, based on proven technologies, has been selected for the leading project in the Western world with construction underway in Canada on the first BWRX-300.
With more than 60 years of nuclear industry experience and a rich legacy of excellence and quality, GE Vernova Hitachi has the energy technologies to help change the world. The BWRX-300 small modular reactor (SMR) is a key part of that mission and a source of electricity generation capable of powering communities across the globe with the energy they rely on to thrive.
How GE Vernova Hitachi is leading the way
units are planned for the Darlington New Nuclear Project
of electricity will be provided by the 4 planned units, enough power for ~1 million homes
jobs to be provided during construction
Explore the construction happening now at the Darlington New Nuclear Project site. This video from Ontario Power Generation (OPG) shows the initial stages of construction on the first of four BWRX-300 small modular reactors at the Ontario, Canada site.
Why the BWRX-300?
GE Vernova Hitachi’s BWRX-300 small modular reactor uses modern construction methods and advanced concrete solutions, inspired by established techniques from GE Vernova’s long history of nuclear expertise and other power industries.
Global deployment
Explore active projects, announced agreements, and regulatory milestones across the globe.
Frequently asked questions
The BWRX-300 SMR is under active construction at the Darlington New Nuclear Project in Ontario, Canada, operated by Ontario Power Generation. It is currently the only grid-scale SMR under construction in the Western world.
Construction is progressing at Darlington, and actual field data is being captured and fed back into the standard configuration. This means lessons learned during construction at Darlington can be applied to future BWRX-300 deployments.
The licensing process looks different for a first-of-a-kind (FOAK) deployment than it does for subsequent nth-of-a-kind (NOAK) deployments. The FOAK deployment establishes the full licensing record, which each subsequent deployment can then benefit from.
The BWRX-300 has completed key licensing milestones with the Canadian Nuclear Safety Commission (CNSC) for the Darlington site and with the United States Nuclear Regulatory Commission (NRC) for the Clinch River site.
The BWRX-300 uses a standardized, modular configuration. The core configuration remains the same across deployment sites, while site-specific adaptations are handled within a defined envelope.
This standardization means lessons learned from one build can be applied directly to the next. The modular approach also allows major components to be fabricated off-site and then assembled at the project site, reducing on-site construction complexity.
Deploying multiple BWRX-300 units on one site allows organizations to build in phases. The first unit can begin generating power and revenue before the second unit is complete.
Site preparation, grid connection, and infrastructure costs can also be shared across multiple units. Each additional unit benefits from the construction lessons captured during the previous build, helping make costs and schedules more predictable. Additionally, strategically sequencing deployment across multiple units on a single site allows the same construction equipment and resources to be rotated on-site, helping reduce overhead costs.
The BWRX-300 uses standard low-enriched uranium (LEU) fuel, specifically GNF2. This is the same type of fuel that has been used in commercial nuclear reactors for decades.
The BWRX-300 does not require a new or experimental fuel type. The fuel supply chain is established, and the fuel is commercially available today.
This is an important difference from some other SMR designs currently in development.
The BWRX-300 uses passive safety systems that rely on gravity-driven natural circulation, instead of pumps or other active mechanical systems.
If the plant needs to be shut down, these systems can bring the reactor to a shutdown state without external power or operator action. Because the safety systems use fewer mechanical components, it also simplifies the plant and can reduce long-term maintenance requirements.
The BWRX-300 can provide dispatchable, carbon-free* baseload power, meaning electricity is available regardless of weather or time of day. It is also capable of changing its output power in order to accommodate grid demand fluctuations.
As more renewable generation is added to the grid, the need for more reliable generation also increases. The BWRX-300 can help meet that need without carbon emissions resulting from operation, supporting both grid reliability and decarbonization** goals without relying on fossil fuel backup.
With 60+ years of boiling water reactor (BWR) service experience, GE Vernova Hitachi Nuclear Energy (GVH) supports the BWRX-300 with standardized, digitally enabled operations and maintenance services.
Recent developments
Stay updated with the latest developments on the BWRX-300 small modular reactor.
Subscribe for updates on the BWRX-300 and other nuclear-related news.
Further reading
Explore additional resources to learn more about the BWRX-300 small modular reactor, its technology, and its potential role in meeting growing energy needs. From fact sheets and technical information to on-demand learning and industry insights, these resources provide additional information to support your understanding of the BWRX-300 and its deployment.
Contact us
*Carbon-free, as used in this document, refers to the absence of carbon dioxide emissions during nuclear power generation and does not include indirect lifecycle emissions.
**Decarbonization, as used in this document, is intended to mean the reduction of carbon emissions on a kilogram per megawatt hour.