The challenge
Due to the region’s increasing presence of renewable energy, the site needed more flexibility to respond faster to California’s ISO system demands. The state’s share of electricity from renewables has more than doubled from <25% renewables in 2008 to ~50% today.*
*Source: California Energy Commission
The solution
The Southern California Edison-owned plant collaborated with GE Vernova to develop a package solution that will reduce its start-up times, and lower emissions without using additional water. The combination of Advanced Gas Path (AGP), Dry Low NOx 2.6+ (DLN2.6+) combustion and OpFlex** software upgrades positioned Mountainview to help balance the region’s grid demands.