GE Vernova’s LM2500 and TM2500 models can be updated to the current LM2500+ or LM2500+G4 configuration for enhanced output and improved thermal efficiency.
The upgrade can be performed through the following options:
Convert existing engine with a modification kit so that it exhibits the same performance as the production +/+G4 model
Replace the existing engine with a production LM2500 +/+G4
Benefits
Up to 33.4 MW gas turbine output at ISO conditions
Up to 12% simple cycle heat rate improvement, or 2.1 points of efficiency improvement with the LM2500+G4 engine
New single crystal hot-section materials and cooling technology to increase life at the new higher firing temperatures
Use with either SAC or DLE combustion systems
GE Vernova will:
Replace the existing engine with a production LM2500 +/+G4
Modify the existing package with a kit that allows for the slightly longer LM2500+/+G4 engine, higher airflow, and higher fuel flow requirements of the replacement engine
Install a new control system existing cabinetry with a new HMI computer to increase re-use of existing material and reduce downtime
Contact us
Contact us for a quote on LM2500+ and LM2500+G4 upgrades.