The M&D Services team identified that a 7E gas turbine shutdown trip was caused by a delayed CBV response, not a mechanical fault. By pinpointing the valve timing issue and ruling out costly hardware damage, the team gave the customer clarity on the true cause of the event.
With targeted recommendations—including valve actuation testing, solenoid checks, and adjustments to instrument air conditions—the site resolved the problem and restored the unit to service.
The result: No repeat trips, avoided downtime, and confidence in reliable operation.