The challenge
Operating in a densely populated region of a densely populated country, Nigeria’s Dangote Cement not only needed to reduce unplanned downtime, but also needed to become energy self-sufficient. With seven aging turbines and a need for digital connectivity, they turned to GE Vernova.
The solution
GE Vernova was set to modernize seven GE Vernova LM6000PC aeroderivative gas turbines—and to install its asset performance management (APM) at Dangote Cement’s plants in Obajana and Ibese. GE Vernova’s digital APM solution is proven in helping reduce unplanned downtime and boosting operational efficiency.