The challenge
Botswana’s electricity supply issues intensified in 2007. As a result of Botswana’s economic growth, demand for electricity began to exceed the county's output capacity. Shortages lead to forced nationwide periods of load shedding: planned supply interruptions that control the distribution of available electricity among customers.
The solution
The plant uses two 45MW GE Vernova LM6000 gas turbines supplied by GE Vernova. These dual fuel Sprint simple cycle units are among more than 6,000 turbines in GE Vernova's fleet installed throughout the world. Orapa station serves as an emergency power facility when supply from conventional electricity generation sources is inadequate to meet demand.