What worked in the past won’t work today

The challenge: timing, not demand

Across aeroderivative fleets, operators are facing a convergence of challenges: extended turnaround times, limited engine availability, budget cycles that don't always align with outage timing, and critical decisions made too late in the maintenance cycle.

Adopting a strategy to keep your operations running is no longer just an option. Visibility and timing are the keys to engine supply. Late-stage planning can force reactive decisions that can result in extended downtime, increased operational risk, and solutions based on availability rather than strategy. That’s where we come in.

Our approach

A lifecycle-driven strategy

aero-engine-upgrades2.jpg

Every operation is different

At GE Vernova, we can help operators better assess how different engine strategies may impact their plant by evaluating factors such as: Availability risk, outage duration and frequency, planning horizon and lead times, alignment with budget and capital cycles. Our aeroderivative services portfolio supports operators across the full engine lifecycle, assisting with decisions around: 

  • Engine exchange to maintain operational continuity
  • End-of-life repowers of aging assets
  • Spare engines aligned with multi-year agreements

Portfolio

Explore our LM6000, LM2500, and LMS100 Multi-Year Agreement offerings

Engine exchanges

Protect availability

Extended turnaround times and constrained availability have made advanced planning for engine exchanges essential. Engine exchanges offer a faster alternative to repairs, not a same-cost substitute, and that value is seen in the time saved during an outage when every day counts. With an engine exchange, operators can:

✔ Reduce exposure to extended outages
✔ Receive a fixed price with simplified quoting
✔ See a faster turnaround (only a 2-3 day outage in most cases) compared to other alternatives like repairs or leases, which could require significant time and additional outages.
✔ Benefit from a GE Vernova included warranty

Your goal: Getting back to operation in the shortest time possible.

Our solution: As the OEM, we offer three exchange pools: new engines, fully refurbished engines, and partial-life engines.

*All engine exchanges and spares are subject to inventory and agreement terms.

Repowers

Updates to match current technology

Planning an engine repower allows operators to make decisions both timely and strategic. Repowering can help operators:

✔ Upgrade engines and refurbish package parts in lieu of total replacement
✔ Align with outages and budget cycles
✔ Increase options for support and continued maintenance
✔ Avoid shipping and transportation with repower work performed onsite

Your goal: Upgrade your package with a new gas turbine that could provide additional power, improve reliability and efficiency, or lower emissions.

Our solution: GE Vernova's team can perform a repower onsite.

*All engine exchanges and spares are subject to inventory and agreement terms.

Spares strategy

Improve outage planning and parts sourcing

When critical spares are secured as part of a Multi-Year Agreement (MYA), operators can plan ahead rather than compete for assets in a constrained market. Operators can:

✔ Secure critical assets before availability tightens
✔ Reduce reliance on short-term lease engines
✔ Align parts availability with maintenance and budget cycles

Your goal: Keeping critical parts available without stressful, last-minute sourcing decisions.

Our solution: GE Vernova structures spare engine coverage within Multi-Year Agreements (MYAs).

*All engine exchanges and spares are subject to inventory and agreement terms.

"Engine availability constraints are reshaping how aeroderivative operators plan for the future. By planning ahead, operators can secure availability, reduce lifecycle uncertainty, and maintain operational flexibility in an increasingly constrained market."
 

Amol Mody, President of GE Vernova's Aeroderivative Services

Services

Explore our aero services and upgrades

Contact us

Take control of your aeroderivative lifecycle strategy

Advanced planning with your GE Vernova Account Manager will help ensure engine availability when you need it.