7E gas turbine upgrades
GE Vernova’s 7E upgrade portfolio helps operators unlock additional megawatts from existing turbines at their next planned outage using proven hardware configurations for the 7EA and 7E.03 fleets.
Engineered to work together
The 7E upgrade portfolio helps operators meet rising power demand by increasing output, extending equipment life, and improving operational flexibility. Developed specifically for the existing 7E family of gas turbines, the portfolio introduces targeted hardware improvements to enhance airflow, hot gas path performance, and overall turbine capability.
These solutions can be implemented individually or as part of a coordinated upgrade strategy, giving power generators flexibility to plan improvements around operational priorities and outage schedules.
Up to ~5% output increase
Combining our upgrades helps deliver greater capacity gains.
Maintenance‑friendly
The hardware integrates with existing service practices and planned outage cycles.
Up to ~2.7% exhaust energy increase
From AGP upgrades to support industrial applications, including LNG.
Faster implementation
Upgrades can typically be planned and installed within ~18 months.
Increasing capacity
Operational flexibility
Asset management
*Trademark of GE Vernova and/or its affiliates.